Water Sales forms are required for a variety of construction projects. Below are printable versions of the commonly used forms. Adobe Acrobat Reader is required to view these PDF documents.
Please contact a Tap Sales representative at 303-628-6100 for additional information about new taps or construction.
- Affidavit Corporation
- Affidavit Individual
- Affidavit Master Meter
- Easement Agreement (Distributor exclusive, 30-foot minimum)
- Easement Agreement (Distributor non-exclusive, 50-foot minimum)
- Easement Agreement (Distributor performance, non-exclusive)
- Easement Agreement (Distributor PUD/PBG, 30-foot minimum)
- Fire Line Demand, Large Connection
- Fire Line Demand, 2" and Smaller Connection
- Frozen Ground Deposit Agreement
- Hydrants: Hydrant forms can be typed on and faxed to our office ahead of time to save wait time during processing. Fax forms to 303-628-6046 and verify with our office for permit pick-up times by calling 303-628-6100.
Effective Sept. 30, 2009, Air Gap Certificates must be completed by a certified ABPA/ASSE backflow assembly tester. A Backflow Assembly Test and Maintenance Report shall be submitted along with the Air Gap Verification form at the time of permit application. We can no longer accept faxed copies after permit has been issued.
- Main Extension Agreement
- Private Pipe Application
- Soil Amendment
- Stub-in Agreement
- Stub-in Agreement - Exhibit A
- Supply License - Inside City
- Supply License - Outside City
- Supply License - Nonpotable














