Reference Denver Water Engineering Standard Details: 33264, 33269
- Service line is perpendicular to the curb-line.
- Stop box and meter pit are in landscaped area, and match finished grade.
- Permanent obstructions are 5 feet clear of the meter pit:
- Utilities, street lights, foundations, fence lines, retaining walls, backflow prevention assemblies.
- Plantings, shrubs and branches must remain 2 feet clear of the meter pit lid.
- Permanent obstructions are 5 feet clear of the meter pit:
- Service line has no bends or connections until 5 feet downstream of the meter pit.
- Stop box is 2 to 5 feet from outside wall of meter pit.
- Service line depth is between 54 and 72 inches.
- Stop box is plumb and centered over the curb valve.
- Service line enters pit (6 o’clock) and exits pit (12 o’clock) without crossing.
- Flow line of meter yoke is 18 inches below the top of dome.